-
HYDRAULIC TENSION EQUIPMENT; PARTICULARLY FOR THE ROPEWAYS WITH CONTINUOUS MOVEMENT
at the ETH Zurich on March 31, 1989.
Collection of the papers and lectures in the original languages on the occasion of the seminar of the same name. -
NON-DESTRUCTIVE TESTING DURING MAINTENANCE OF ROPEWAYS
at the Federal chamber of trade and industry, Vienna on April 19, 1991
Collection of the papers and lectures in the original languages on the occasion of the seminar of the same name. -
SAFETY MEASUREMENTS FOR SHEAVES-WHEELS FOR ROLLERBAT-TERIES OF MONOCABLE SYSTEMS
in Zurich on April 27, 1994
Download Online version- All docunents
(ZIP 62078 KB)
- All docunents
-
QUALITY AT ROPEWAYS - INNOVATIVE PATH INTO THE FUTURE
in Munich on September 30, 1996.
Download- Introduction to "Total Quality Management"
- from quality assurance as set out in EN ISO 9000 to Total Quality Management (TQM)
- quality assurance according to EN ISO 9000; standards, historical outline, background, extension of manufacturing industry, applications in services
- Total Quality Management Concerning EN ISO 9000 published aspects, overall, comprehensive evaluation
- TQM as it concerns Ropeways
- Example for the emergency services and preparatory work already carried out for firms in the operator association of country
- Quality Management during operation/maintenance of equipment
- Maintenance and commissioning
- Spare parts and procurement
- Staff selection and qualifications
- Employee training in the technical field
- Quality of service at the client’s location
- the optimal attitude of the staff towards the client
- guidance of the visitors in the stations
- guidance of the visitors in the resort
- information and tips
- Quality as it concerns the environment
- Ecological Audit
- Quality of the resorts and region as a whole
- Installations and ski-runs
- Benchmarketing
- Qualität ganzer Stationen/Regionen - FR
(MS WORD 112 KB)
- Introduction to "Total Quality Management"
-
RELIABILITY OF ROPEWAYS AND SAFETY REQUIREMENTS WITH SPECIAL CONSIDERATIONS OF PROGRAMMABLE CONTROL SYSTEMS
in Bolzano on October 16, 1997.
Download- The risk as a designing parameter regarding ropeway systems
Prof. Dr. Eng. Giorgio PAOLINI (I) Politecnico di Milano Vice-president of the O.I.TA.F. Chairman of the committee no. II of the O.I.T.A.F. (MS WORD 52 KB) - Analysis of probability applied for the designing of machine equipment regarding reversible aerial ropeway
Prof. Dr. Eng. Enrico BAZZARO (I) Politecnico di Milano Coauthors: F. LEVI (Politecnico di Milano) S. BARAGETTI (dito) (MS WORD 558 KB) - Safety requirements regarding programmable, electronic systems for ropeways
Mr. Eng. Klaus-Michael BOSCH (D) Product Manager TÜV Product Service GmbH Sector EMA-IQSE (MS WORD 270 KB) - Application of programmable devices in the security facilities of ropeway installations
Mr. Marcel FELICE (F) Director of Engineering Semer SA (MS WORD 59 KB) - State of European standardization TC 242, standard no. 8
Mr. Eng. Ruedi SCHÜLE (CH) Chairman of the committee no. IIIe of the O.I.T.A.F. Chairman of the work group F of the CEN TC 242, standard no. 8 (Electrical installations) (MS WORD 31 KB) - Programmable control systems at ropeways in Austria
Mr. Eng. Helmut WRBA (A) Leiter des Seilbahnreferates für Elektrotechnik und Sicherungstechnik des Bundesministeriums für Wissenschaft und Verkehr, Wien (MS WORD 2426 KB) - Application of programmable control systems, such as at the highperformance ropeway in Montjuic
Mr. Eng. Anton HUBER (A) Leiter der Abteilung Seilbahntechnik Siemens AG Österreich (MS WORD 2321 KB) - Main guidelines of Italian regulations regarding electrical equipments at ropeway systems
Dr. Eng. Claudio VISENTIN (I) Former Director of the ropeway service in the province of Trient (I) Co-authors: Dr. Eng. Gabriele CAPPELLO (BMB Elettronica Industriale - Ansaldo - Montebello) Dr. Eng. Andrea FORNASA (EEI - Equipaggiamenti Elettronici Industriali Vicenza) (MS WORD 57 KB)
- The risk as a designing parameter regarding ropeway systems
-
ROPEWAYS AND EUROPE
economical, legal and financial aspects of the community law in Grenoble on April 23, 1998.
Download- The European right and its effects on ropeway installations and skiing areas
by Jean-Paul Richard (Commission UE) - The EURO and its consequences on the industry and operators
by Jean-Paul Bourgés (directeur à la Lyonnaise - France) (MS WORD 14 KB) - Skiing slopes and the European regulations
Dr. Wolfgang Großlercher (Director of the tourism office - Bolzano Italy) (MS WORD 20 KB) - The environment and alpine convention
Prof. Dr. Peter Keller (chef of the swiss tourism office - Bern - CH) (MS WORD 80 KB) - European instructions on transportation by rope and its standardization
Hubert du Mesnil (Director of the transport by ropewy - France) (MS WORD 20 KB) - European regulations and governmental subventions in favor of mechanical installations
Dr. Walter Thöny (ropeway of Arlberg - Austria) (MS WORD 46 KB)
- The European right and its effects on ropeway installations and skiing areas
-
EXTENT TO WHICH PRESENT DAY TECHNICAL LIMITS AFFECT THE CONSTRUCTION OF ROPEWAYS
in Bolzano on October 12, 2001
Download- DREAMS
Ferruccio Levi Designer Milano (I) The papers is available in italian (MS WORD 64 KB) - DREAMS
Ferruccio Levi Designer Milano (I) The papers is available in italian (MS POWERPOINT 2227 KB) - ROPE PRODUCTION AND ITS TECHNICAL LIMITS
Bruno Longatti Fatzer Romanshorn (CH) The paper with picture is available in german in the secretary’s office of O.I.T.A.F. (MS WORD 46 KB) - ROPE GUIDANCE AND ITS TECHNICAL
Hans Ulrich Zbil TÜV – Bayern Jenbach (A) The paper is available in german (MS WORD 2405 KB) - LIMITS OF THE GUIDANCE CAPABILITY OF SUPPORT/COMPRESSION ROLLER BATTERIES
Gabor Piskoty EMPA Dübendorf (CH) The paper is available in german (MS WORD 426 KB) - UNI-DIRECTIONAL MONOCABLE AERIAL ROPEWAYS WITH FIXED TENSIONING
Wilhelm Kaul Civil engineer Wolfurt (A) The paper is available in german (MS WORD 50 KB) - UNI-DIRECTIONAL MONOCABLE AERIAL ROPEWAYS WITH FIXED TENSIONING
Wilhelm Kaul Civil engineer Wolfurt (A) The paper is available in german (MS WORD 41 KB) - FUNICULAR TRACK LAYOUT AND SPEED LIMITS
Walter Sehnal Leitner AG Vienna (A) The paper is available in german (MS WORD 1498 KB) - EMBARKING AND DISEMBARGKING CAPACITY LIMITS OF AERIAL ROPEWAYS
Francis Charamel Pomagalsky Voreppe (F) The paper is available in francais (MS WORD 2378 KB) - ARE THE LIMITS SHOWN BY MODERN METHODS OF VERIFICATION OF THE FATIGUE STRENGTH REALISTIC AND APPLICABLE TO CARRIERS OF UNI-DIRECTIONAL MONOCABLE ROPEWAYS
Josef Sutter Doppelmayr Wolfurt (A) The paper is available in german (MS POWERPOINT 4092 KB) - VISIONEN-Darstellung
(MS POWERPOINT 2227 KB)
- DREAMS
-
SPECIFIC LEGAL AND ECONOMIC ISSUES OF THE ROPEWAY INDUSTRY
in Innsbruck (A) on October 09, 2002
Download- CURRENT LIABILITY ISSUES OF THE ROPEWAY INDUSTRY
by RA. Dr. Helga WAGNER, legal expert of the German Ropeway Association VdS in german (MS WORD 72 KB) - ROPEWAY MANUFACTURERS’ PRODUCT LIABLITY
by Kurt LEITNER, Honorary President of firm Leitner in geman (MS WORD 46 KB) - ROPEWAY TRANSPORTATION OF CHILDREN AND RELATED LEGAL PROBLEMS
by Jörg SCHRÖTTNER, Ministry of Transportation, Innovation and Tecnology in geman (MS WORD 93 KB) - NIVELLIANCE - MUTUAL INSURANCE SCHEME AGAINST OPERATING RISKS
by Dèl. Gén. Jean-Charles SIMIAND; 1. Vice president of O.I.T.A.F., President of SNTF (F) in france (MS WORD 108 KB) - AN INTERNATIONAL COMPARISON OF SKIERS’MAIN STREET
by Jean-Louis PETTEX, Directeur Compagnie des Alpes (F) in cooperation with NSAA (USA) in france (PDF 863 KB) - FINANCIAL, OFFER AND MARKET INDICES FOR OPERATORS; THE INDUSTRY AND AUTHORITIES
by Dr. Riet THEUS, management consultant (CH) in german (PDF 76 KB) - INDICES, AS USED IN ACTUAL PRACTICAL WORK
by Mag. Klaus Grabler, MANOVA, Vienne (A) in german (MS WORD 231 KB) - ENVIRONMETAL TOURISM AND TRANSPORTATION IN A MONTAIN AREA
by Prof. Dr. Drago Sever, M. Sc. Janez Sirse und Gorazd Bedrac, in english (MS WORD 1104 KB)
- CURRENT LIABILITY ISSUES OF THE ROPEWAY INDUSTRY
-
OPTIMISATION OF ROPEWAY OPERATION
in Bolzano on October 03, 2003
Download- MODERNISATION OF EXISTING ROPEWAY INSTALLATIONS
by Michael FOUCHE - POMAGALSKI, France The papers is available in france (MS POWERPOINT 2498 KB) - INTERPRETATION OF SAFETY REQUIREMENTS OF THE EU DIRECTIVE RELATING TO CABLEWAY INSTALLATION DESIGNED TO CARRY PERSONS - THE EUROPEAN DIRECTIV’S IMPACT ON ROPEWAY OPERATION
by Fritz MEYER -SUVA, Switzerland The paper is available in german (MS WORD 1083 KB) - ASSESSMENT OF OCCUPATIONAL HAZARDS - A SCHEME FOR PROGRESS
by Michel GRANIER - CRAM, France The paper is available in france (MS POWERPOINT 2646 KB) - A NEW TECHNICAL AID FOR THE VISUAL INSPECTION OF ROPES
by Frank WAGNER - BG BAHNEN Hamburg, Germany (PDF 957 KB) - THE "QUALITY" OF OPERATIONAL MANAGEMENT - QUALITY SCHEME ISO 9001 AND ITS IMPACT ON ROPEWAY OPERATION
by Hervé LENOIRE - SNTF, France The paper is available in france (MS POWERPOINT 710 KB) - COMPUTER ASSISTED MAINTENANCE - APPLICATION OF AND EXPERIENCE MADE WITH COMUTER ASSISTED MAINTENANCE PROGRAMMS FOR ROPEWAY
by Hannes Steinlechner, Arberger Bergbahnen AG, St. Anton am Arlberg, Austria - ADVANTAGES OF A MAINTENANCE CHECK-LIST FOR CABLEWAY INSTALLATIONS
by ANITIF (association of italian ropeways tecnician) reporter: Marco Rinaldi president of ANITIF, Italy The paper is available in italian (MS WORD 42 KB) - ADVANTAGES OF A MAINTENANCE CHECK-LIST FOR CABLEWAY INSTALLATIONS
by ANITIF (association of italian ropeways tecnician) reporter: Marco Rinaldi president of ANITIF, Italy The paper is available in italian (MS WORD 1270 KB) - PREVENTIVE MAINTENANCE WORK AT NIGHT
by Manuel SALSAS - Bequeira Beret SA, Spain - COMBINED MULTIPLE PURPOSE TERMINALS FOR DIFFERENT CARRIAGE SYSTEMS: GONDOLAS AND CHAIRS - A NEW TRANSPORT SOLUTION
by Gerhard GABRIEL - Andreas NATTER - Doppelmayr, Austria (PDF 1230 KB)
- MODERNISATION OF EXISTING ROPEWAY INSTALLATIONS
-
O.I.T.A.F. ROUND TABLE CONFERENCE 2004
in Grenoble (F) on April 22, 2004
Download- Richtlinie 2000/9/EG – Von der Theorie zur Praxis
SAM 2004 – ALPEXPO GRENOBLE - FRANCE
14:30 Opening by O.I.T.A.F. Chairman, Mr. Horst Kühschelm
14:45 Intervention of the European Commission: Presentation of the directive by Mrs. Martinez Arriola (available in france)
15:15 Round Table conference
17:15 Closing address by O.I.T.A.F. Chairman, Mr. Horst Kühschelm
17:30 End of the conference
Coordinator of the round table: Jean Charles Simiand (1st Vice-president of the O.I.T.A.F.)
Participants: J.P. Huard, M. Mathis, L. Reynaud, A. Laherstorfer, B. Martinez-Arriola, A. Soury-Lavergne, H. Steinlechner, S. Lazzari, F. Cullerè, H. Brugger
The whole recording with the presentation of Mrs. Arriola Martinz and the following discussion of the round table is in the original languages from the general secretary of the OITAF (I-392100 Bozen, Crispistr. 10 & Amt für Seilbahnen) as Audio-CD (119 MB) available. (MS WORD 50 KB)
- Richtlinie 2000/9/EG – Von der Theorie zur Praxis